HomeBlogUncategorizedAustralian data – Q1 2025 Construction Work Done +0.0% q/q (vs. expected +0.4%)

Australian data – Q1 2025 Construction Work Done +0.0% q/q (vs. expected +0.4%)

Australian Q1 2025 Construction Work Done

0.0% q/q, not a good result, well under expected and well under the previous quarter

expected +0.4%, prior +0.5%

At 0% on the quarter construction will add nothing to Q1 GDP:

public sector work was weak, dragging down the headlineresidential building was a little better, s flow of work in that sector

***

Construction work done includes building work (residential and non – residential) and engineering work.

This article was written by Eamonn Sheridan at www.forexlive.com.


Leave a Reply

Your email address will not be published. Required fields are marked *

Contact information

If you have any queries or complaint reach us out.

Copyright: © 2024 – All Rights Reserved. Made with 💛 by A2Solutions.